Tuesday, November 9, 2010

Schwinn Johnny G Spinner Review

17/11/1910 - 11/10/1910

This is the last date for correction. The delivery is divided by type:

For groups that have HOUSING:
-plants (all, from underground, if any, to the bottom of roofs -5 ° front-) esc 1:50
-structural Plant ( may be on the same scale or 1:100) 1:50

-View-Cortes, at least 2 at 1:50

-sector Detail facade on the ground / s cut view with addition of color, texture , shadows, etc 1.20 (representative of the project and analyzed different scale 1:50)
history
-Planes (A3 delivery, baseline)
-Imagen/croquis to express the idea or concept of building

For groups that have CINEMA / THEATRE / AUDITORIUM / etc.:

Of the entire building:
-plants (all, from underground, if any, to the ceiling plant fachada-/implantación -5 °) esc 1:100 (or 1:200 to check with teachers according to each project)
-structural plants (can be in the same scale or 1:200)
-General views 1:100 (or 1:200 to check with teachers according to each project)

In a sector:
-sector plants (all, from underground, if any, to -5 ° ceiling plant front-) 1:50 esc
-Cortes in this sector, at least 2 at 1:50
-view of that sector,
1:50
sector Detail-Detail
facade facade sector in plant / s cutting view to incorporating color, texture, shadows, etc 1.20 (representative of the project and analyzed different scale 1:50)

-Planes background (the surrender of A3, the starting point)
-Imagen/croquis to express the idea or building concept



Delivery: November 17
Levantamineto of Minutes: November 24

0 comments:

Post a Comment